" Performance Enhancement successfully implemented Lean Manufacturing throughout our factory. Firstly introducing a Kanban Parts System for all door components and then installing the machinery into an integrated cellular manufacturing structure, as per the revised factory layout.
Such innovations, combined with a radical overhaul of the existing operational planning system, allowed Kelly Brothers double production, thus preserving our position as Ireland’s premier manufacturer of Red Deal Doors.
We continue to draw upon Performance Enhancement’s consultancy expertise and business advice on an ongoing basis. I am particularly appreciative of the assistance given in the recruitment and strengthening of our graduate management team: a team which has enabled Kelly Brothers develop creatively styled doors, with enhanced fire safety features, to our ever-increasing architectural and interior designer client market."
John Kelly M.D., Kelly Brothers (Ireland)